Page 5
10-14-2008
Back to Work on the HP2.
Now that all the summer fun is
coming to an end,
time to get back into the HP2.
Sunday Morining
after I spent a couple of hours
servicing the Serro Scotty
with new Brake Calipers, Accessory
Wiring and Detailing I
Moved to the HP2.
I trimmed back the Head Liner fitted
all the Lace. After that was
compete, I installed the Dash,
and all the interior trim.
All that is left to do in the interior
is- trim the carpet, install the seats,
kick panels, package tray and sill
plates.
I love the look of the Red Interior
over the Blue Paint.
A Radio was not even offered in
this Belvedere I
Heater Delete plate and Basic Steering
wheel
complete this Dash
Time to visit the Master Blaster
to have the seat frames
sand blasted and painted. Then
new covers by the
end of the month. after that off
to Old Saybrook Auto Services
for a Stainless X Pipe Exhaust
and a Performance Front End
Alignment.
Page
1
Page
2
Page
3
Page 4
Page 6
